Short Story

Repainting and General Repairs of Form 5 Classrooms.

If you would like to make the contribution by cheque or manual bank transfer, please click here to browse our FAQs.

Kuala Kangsar, Malaysia

Form 5 Classrooms

RM60,200.00 Raised
61 Backers
0 Days Left
Raised:
100.33%
Goal: RM60,000.00
The campaign is successful.
7 Campaigns | 0 Loved campaigns

Story

Parent initiatives and X Programme added to the government grants and allocations for the up-keep of MCKK buildings and the MCKK Stakeholders’ disbursements for them. In the past 3 years, the bilik guru was totally made over, the music room refurbished and the Form 4 and Form 3 classes were spruced up to be more conducive to classroom use. It had been requested that the Form 5 classrooms be given a little facelift.

Of the classrooms, the Form 5 classrooms are still hemmed in by asbestos ceilings, which date back to the 70s. The ceiling panels deformed and sagged, and watermarks from leaks over the decades are plain to see. The Project intends to replace ceilings and doors, apply a fresh coat of paint and associated electrical works.

The following findings were observed by the MCKK Restoration Sub-committee during their assessment in May 2021:

  1. Walls are faded and dirty.
  2. Damaged doors.
  3. Traces of leaks on the ceiling. Ceiling panels deformed and sagging.
  4. Ceiling material is made of old soft board and is a fire hazard; not currently allowed for use by BOMBA and DOSH.
  5. Ceiling material likely contain asbestos which is a health hazard.

Impacts to students:

  1. Ceiling condition and material poses safety and health issues.
  2. Overall condition of the classrooms is not inviting or conducive for learning.

The proposal:

  1. Scraping and repainting of existing walls, including corridor walls.
  2. Replace all classroom doors.
  3. Replace the entire ceiling with plaster ceiling.
  4. Re-wiring and conduit installation from distribution board (DB) to fittings.
  5. Dismantling of existing lighting, fans and other conduits and installation of new fittings (some fittings may still be reused).
  • 06-08-2021

    Repainting and General Repairs of Form 5 Classrooms start.

Name Contribution Amount Date
Mohamad Zuwairi Abd Rahman RM1,000.00 13 August 2021 8:21 AM
Anonymous RM200.00 13 August 2021 8:18 AM
Anonymous RM200.00 13 August 2021 2:36 AM
Anonymous RM100.00 13 August 2021 1:36 AM
Anonymous RM100.00 12 August 2021 11:02 PM
Eiran Fariz Maamor RM100.00 12 August 2021 10:43 PM
Anonymous RM100.00 12 August 2021 10:39 PM
MOHD AFFENDI MOHD SHAFRI RM200.00 11 August 2021 3:11 PM
MOHD HAFIZI MOHD ZAWAWI RM100.00 11 August 2021 1:52 AM
Anonymous RM100.00 10 August 2021 4:58 PM
rohi shari RM100.00 10 August 2021 4:49 AM
Anonymous RM100.00 10 August 2021 3:53 AM
Abdul Salaam Mohd Anver RM100.00 9 August 2021 5:13 AM
Zamros Yusof RM500.00 9 August 2021 12:17 AM
Eiran Fariz Maamor RM200.00 8 August 2021 11:56 PM
Hilmi Yusof RM200.00 8 August 2021 12:15 PM
Anonymous RM200.00 7 August 2021 9:28 AM
Anonymous RM200.00 7 August 2021 4:49 AM
Anonymous RM200.00 7 August 2021 2:18 AM
Yusri Jaafar RM100.00 7 August 2021 2:17 AM
MCKK Class of 2001 RM20,050.00 7 August 2021 2:11 AM
Mohammad Noraizi Mohammad Nor RM50.00 6 August 2021 9:44 PM
Anonymous RM10,000.00 6 August 2021 1:00 PM
Normah Mukhtar RM100.00 6 August 2021 5:12 AM
Anonymous RM100.00 6 August 2021 5:00 AM
Shaharum Ramli RM1,000.00 6 August 2021 3:25 AM
Anonymous RM150.00 6 August 2021 1:52 AM
Abdul Shukur Ishak RM200.00 6 August 2021 1:43 AM
Anonymous RM100.00 6 August 2021 1:04 AM
NAHRIZUL ADIB KADRI RM100.00 6 August 2021 1:00 AM
Mohd Fadzli Mohamad Isa RM200.00 6 August 2021 12:15 AM
Anonymous RM100.00 5 August 2021 11:43 PM
SHAHRUNIZA MD SHAHIR RM500.00 5 August 2021 11:38 PM
Anonymous RM100.00 5 August 2021 11:16 PM
AHMAD FADZIL MOHAMAD HANI RM1,000.00 5 August 2021 1:16 PM
ZUL ZARIHI Zainal RM500.00 4 August 2021 4:33 PM
Anonymous RM500.00 4 August 2021 3:04 AM
Anonymous RM100.00 4 August 2021 2:18 AM
Anonymous RM100.00 3 August 2021 2:15 PM
Anonymous RM200.00 3 August 2021 1:55 PM
Anonymous RM100.00 3 August 2021 1:39 PM
Anonymous RM100.00 3 August 2021 12:06 PM
Amir Soffian Abdul Razak RM200.00 2 August 2021 11:13 PM
Anonymous RM50.00 2 August 2021 5:38 PM
Shahrul Anuar Saat RM200.00 2 August 2021 1:10 PM
Mohammad Ashraf Md Radzi RM500.00 2 August 2021 11:18 AM
Anonymous RM100.00 2 August 2021 10:40 AM
Afif khairi Ridwan RM100.00 2 August 2021 10:36 AM
Hashim Amidi Ahmad RM1,000.00 2 August 2021 8:52 AM
Anonymous RM500.00 2 August 2021 8:50 AM
Azeem Zuhair Noor Azhar RM50.00 1 August 2021 3:49 PM
KHAIRUL ANAM ISMAIL RM50.00 1 August 2021 2:59 PM
Anonymous RM100.00 1 August 2021 7:03 AM
Huzarif Hatim RM100.00 1 August 2021 6:29 AM
Mohammad Jefri Mokhtar RM100.00 1 August 2021 5:46 AM
Syahriman Md Shahir RM500.00 1 August 2021 3:22 AM
Darwis AR RM1,000.00 1 August 2021 2:19 AM
Anonymous RM100.00 31 July 2021 3:29 PM
Dzulkifly Mohd Zain RM100.00 31 July 2021 5:35 AM
Tab, Amok, & Sarp RM15,000.00 31 July 2021 5:05 AM
Ahmad Shahizam Mohd Shariff RM1,000.00 31 July 2021 4:32 AM